0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 25 December 2009
Status: in use

Project Type

Location

Location: , ,
, ,
Part of:
Location description:

The bridge links Jintang Island to Zhoushan and Ningbo

Coordinates: 30° 0' 21" N    121° 40' 6.55" E
Coordinates: 30° 3' 21.77" N    121° 51' 21.70" E
Show coordinates on a map

Technical Information

Dimensions

main span 620 m
total length 21.029 km
pylons height 202.5 m

Cost

cost of construction Renminbi Yuan 7 000 000 000

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20015468
  • Published on:
    09/03/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine