0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 2008
Duration of works: 36 months
Status: in use

Project Type

Structure: main bridge:
Self-anchored suspension bridge
secondary span:
Girder bridge
Function / usage: Road bridge
Material: main bridge:
Steel bridge
approach viaducts:
Prestressed concrete bridge
Construction method: secondary span:
Balanced cantilever method

Location

Location: , ,
Crosses:
  • Qiantang River
Coordinates: 30° 19' 11.42" N    120° 24' 33.16" E
Show coordinates on a map

Technical Information

Dimensions

width 47 m
total length 4 332 m
main bridge 1
total length 426 m
span lengths 83 m - 260 m - 83 m
number of spans 3
main bridge 2
total length 343 m
span lengths 91.5 m - 190 m - 91.5 m
number of spans 3
main bridge 3
total length 426 m
span lengths 83 m - 260 m - 83 m
number of spans 3

Quantities

structural steel 11 000 t
concrete volume 36 000 m³

Cost

cost of construction Renminbi Yuan 1 890 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20045476
  • Published on:
    18/06/2009
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine