• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Jesse H. Jones Memorial Bridge

General Information

Other name(s): Houston Ship Channel Bridge
Beginning of works: 1980
Completion: 1982

Project Type

Location

Location: , , ,

Technical Information

Dimensions

total length 3.2 km
clearance 53 m x 152 m
span lengths of main bridge 114 m - 229 m - 114 m
deck deck depth 4.60 - 14.30 m
deck width 18 m
main bridge
length 475.5 m

Cost

cost of construction United States dollar 60 000 000

Materials

deck prestressed concrete
deck of approaches precast prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007186
  • Date created
    10/12/2002
  • Last Update
    05/02/2016