General Information
Name in local language: | 生口橋 (Ikuchi-bashi) |
---|---|
Beginning of works: | December 1986 |
Completion: | December 1991 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Structure: |
Three-span cable-stayed bridge |
Support conditions: |
for registered users |
Material: |
Material hybrid bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Material: |
main span: Steel bridge side spans: Prestressed concrete bridge |
Location
Location: |
Ikuchi, Hiroshima, Japan Innoshima, Hiroshima, Japan |
---|---|
Part of: | |
Location description: | |
Coordinates: | 34° 18' 14.26" N 133° 9' 0.48" E |
Technical Information
Dimensions
main span | 490 m | |
total length | 790.0 m | |
vertical navigation clearance | 26.0 m | |
abutments | number | 2 |
deck | deck width | 23.9 - 24.1 m |
pylons | height | 122.750 m |
number | 2 |
Materials
cables |
steel
|
---|---|
pylons |
steel
|
deck of main bridge |
steel
|
deck of approach viaduct |
prestressed concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Bridges - Ponts - Brücken. Atrium, Mexico City (Mexico), pp. 92-93. (2002):
- Design and construction of a cable-stayed bridge with mixed structure. Presented at: IABSE Symposium: Mixed Structures, including New Materials = Construction mixte acier, béton et nouveaux matériaux = Misch- und Verbundbauweisen einschliesslich neuer Baustoffe, Brussels, Belgium, 1990. (1990):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 679-680. (1999):
- 複合斜張橋「生口橋」の設計と施工 (Design and Construction of Complex Cable-Stayed Bridge for Ikuchi Bridge). In: Concrete Journal (JCI), v. 30, n. 2 ( 1992), pp. 31-45. (1992):
- About this
data sheet - Structure-ID
20001321 - Published on:
18/02/2001 - Last updated on:
15/09/2023