• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Heerstraßenbrücke

General Information

Beginning of works: 2005
Completion: 2006
Status: in use

Project Type

Location

Location: Stuttgart, Baden-Württemberg, Germany
Leinfelden-Echterdingen, Esslingen (Kreis), Baden-Württemberg, Germany
Coordinates: 48° 41' 52.87" N    9° 11' 14.45" E

Technical Information

Dimensions

total length 146.00 m
span lengths 23.58 m - 26.74 m - 34.00 m - 34.68 m - 27.00 m
bridge surface 2 095 m²
deck width 13.25 m
piles diameter 1.20 m

Quantities

deck structural steel 615 t
concrete volume 605 m³
reinforcing steel 180 t
foundations concrete volume 500 m³
reinforcing steel 76 t
piles reinforcing steel 31 t
total length of piles 265 m
substructure concrete volume 585 m³
reinforcing steel 105 t

Design Loads

live load DIN FB 101
ML 50/50 – 100 (STANAG)

Cost

cost of construction Euro 3 930 000

Materials

piers reinforced concrete
foundations reinforced concrete
piles reinforced concrete
deck slab prestressed concrete
abutments reinforced concrete
girders steel
pile caps reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043657
  • Date created
    18/02/2009
  • Last Update
    05/02/2016