• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Hangbrücke Puchreit

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 1977
Completion: 1979
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Segmental construction
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Puchreit, Krems in Kärnten, Carinthia, Austria

Technical Information

Dimensions

total length ca. 1 km
weight of precast segments max. 600 kN
length of precast segments 3.3 m
standard span lengths 55 m
deck deck depth 3.8 m

Materials

deck precast prestressed concrete
piers reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20006431
  • Date created
    18/10/2002
  • Last Update
    22/07/2014