• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Guadarrama Tunnel

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Other name(s): Túnel de Guadarrama
Beginning of works: 2002
Completion: 2007
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Tunnel boring machine (TBM)

Geographic Information & Related Structures

Location: Segovia, Segovia, Castile-Leon, Spain
Part of:

Technical Information


total length 28 419 m
interior diameter 8.50 m
excavation diameter 9.45 m


tunnel structure reinforced concrete


Geotechnical engineering
TBM manufacturer

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
  • Date created
  • Last Update