• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Ghadir Bridge

General Information

Completion: 1999
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Construction method: Segmental construction
Material: Prestressed concrete bridge

Location

Location: , ,
Crosses:
  • Zayandeh River

Technical Information

Dimensions

main span 70 m

Materials

deck precast prestressed concrete

Participants

Structural engineering

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20033070
  • Date created
    05/11/2007
  • Last Update
    05/02/2016