• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Gateway Bridge

General Information

Beginning of works: 1980
Completion: 1986
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Brisbane River
Next to: Gateway Bridge (2010)
Coordinates: 27° 26' 40.92" S    153° 6' 3.60" E

Technical Information

Dimensions

main span 260 m
number of lanes 6
deck deck depth max. 15 m
deck width 21.93 m

Materials

superstructure prestressed concrete

Notes

On completion the main span was the world record (260m) for a prestressed concrete Free Cantilever Bridge. It held this record for over 15 years
The box girder is still the largest prestressed concrete, single box in the world , measuring 15m deep at the pier, with a box width of 12m and an overall deck width of 22m (6lanes).

Participants

Design concept
Consulting engineers
Subconsultant
Main contractor
Formwork

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002214
  • Date created
    09/11/2001
  • Last Update
    05/02/2016