General Information
Completion: | 19 July 1900 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Below grade metro or light-rail station |
---|---|
Structure: |
Underground structure |
Location
Location: |
Paris (12th), Paris, Ile-de-France, France |
---|---|
Part of: | |
Coordinates: | 48° 50' 40.92" N 2° 22' 26" E |
Technical Information
There currently is no technical data available.
Excerpt from Wikipedia
Gare de Lyon is a station on lines 1 and 14 of the Paris Métro. It is connected to the Gare de Lyon mainline rail and RER stations within one complex and is the third-busiest station on the network with 30.91 million entering passengers in 2004, made up of 15.78 on line 1 and 15.13 on line 14.
Line 1
The line 1 station was one of the eight original stations opened as part of the first section of line 1 between Porte de Vincennes and Porte Maillot on 19 July 1900. It was built with a length of 100 metres instead of the 75-metre length used for the stations of the line before their extension during the rebuilding of the line for rubber-tyre operation. The station was built cut and cover and is covered by a 23.90-metre-wide metal deck, which supports the streets above. It originally had four lines flanking two 6-metre-wide platforms in order to accommodate the proposed circular line (then called Line 2), although this was never completed. From 1 August 1906 the northern terminus of Line 5 was temporarily located at the spare platforms, requiring a reversal at Quai de la Rapée. On 17 December 1906 Line 5 was extended to Jacques Bonsergent and the section between Quai de la Rapée and Gare de Lyon was closed. The route of the closed line and the spare platforms at Gare de Lyon were used as part of a 60 cm (24 in) gauge railway, known as the Voie des Finances, operated by the Ministry of Finance to move currency from 1937 to 1957.
The Line 1 platforms were raised during the weekend of 18 and 19 July 2009 as part of the automation of Line 1.
Line 14
The station of Line 14 was opened on 15 October 1998. It is located south of the Gare de Lyon in the Rue de Bercy, next to the stations of RER lines A and D. It has two lines on either side of a large central platform. Between the eastbound lane from Olympiades and the RATP headquarters is an exotic garden.
The Board of Directors of the Syndicat des transports d'Île-de-France decided on 27 May 2009 to provide funding in 2010 for a third access in the middle of the platform to facilitate movement within the busy and relatively narrow station. This new access will join the existing bridge over the tracks, which currently provides access to the RER, but is not used to access Line 14. This would separate the flow of arriving and departing passengers.
Text imported from Wikipedia article "Gare de Lyon (Paris Métro)" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20051551 - Published on:
08/01/2010 - Last updated on:
25/01/2022