• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Franconia Bridge

Frankenbrücke Coburg
Photographer: Atelier Engel, Werkstätte für Fotografie, Sonnefeld.

General Information

Other name(s): Frankenbrücke
Beginning of works: 1991
End of works: 1994
Status: in use

Project Type

Structure: Multiple T-section girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Geographic Information & Related Structures

Location: Coburg, Bavaria, Germany

Technical Information

Dimensions

length of ramp bridges 185 m
span lengths of main bridge 37.48 m - 2 x 29.16 m - 33.79 m - 49.40 m
span lengths of ramp bridges 20.70 m - 20.50 m - 39.75 m / 42.26 m - 2 x 20.50 m - 20.70 m
deck deck width 20 m / 6 m
main bridge
length 179 m

Cost

cost of construction German Mark 26 350 000
cost of construction per m2 German Mark 5728

Materials

substructure reinforced concrete
deck prestressed concrete

Notes

The ramp bridges are slab bridges.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001151
  • Date created
    08/12/2000
  • Last Update
    29/07/2014