• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Francis Scott Key Bridge

General Information

Beginning of works: 1917
Completion: 1923
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , ,
, , ,
Crosses:
  • Potomac River
Replaces: Aqueduct Bridge (1888)
Coordinates: 38° 54' 8.59" N    77° 4' 11.74" W

Technical Information

Dimensions

main span 63.40 m
total length 518.5 m

Materials

arches reinforced concrete

Participants

Construction
(role unknown)

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000504
  • Date created
    16/11/1999
  • Last Update
    05/02/2016