0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2011
Completion: 2017
Status: in use

Project Type

Structure: Arch dam
Function / usage: Hydroelectric dam / plant
Material: Concrete dam

Location

Location: ,
, ,
Impounds:
  • Tua
Coordinates: 41° 13' 4.77" N    7° 25' 24.31" W
Show coordinates on a map

Technical Information

Dimensions

height 108 m
crest length 275 m
crest thickness 5 m

Case Studies and Applied Products

Elaborate engineering services for Foz Tua Dam, Portugal

Elaborate engineering services for Foz Tua Dam, Portugal

PERI devised and supplied an optimised and safe formwork and scaffolding solution for construction of the Foz Tua Dam and the associated pumped-storage power station. The PERI specialists supported the construction firm, Barragem de Foz ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20067851
  • Published on:
    07/10/2015
  • Last updated on:
    28/02/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine