0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: October 1936
Status: demolished (2004)

Project Type

Awards and Distinctions

1936 Honorable Mention  

Location

Location: , , ,
, , ,
Crosses:
  • Fore River
Replaced by: Fore River Lift Bridge (2018)
Coordinates: 42° 14' 39.01" N    70° 58' 4" W
Show coordinates on a map

Technical Information

Cost

cost of construction United States dollar 2 400 000

Materials

piers reinforced concrete
truss steel

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20010595
  • Published on:
    03/11/2003
  • Last updated on:
    02/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine