• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Engelberg Tunnel

General Information

Beginning of works: 2001
Completion: 2010
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel

Location

Location: , ,

Technical Information

Dimensions

length 4 043 m
tunnel section area 28 - 52 m²
longitudinal slope 10.5 %

Design Loads

design speed 40 km/h

Cost

cost of construction Swiss Franc 176 500 000

Participants

Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20062534
  • Date created
    08/12/2011
  • Last Update
    25/07/2014