0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Transrapid Versuchsanlage Emsland
Beginning of works: 1980
Completion: 1987
Status: out of service

Project Type

Location

km Name

Technical Information

Dimensions

total length 31.5 km

Chronology

1980 — 1984

Construction of section 1 with the test center, 10-km straight section, northern turn-around and two steel switches.

1984 — 1987

Construction of section 2 with another steel switch and southern turn-around.

22 September 2006

During a test run a maglev train collides with a repair wagon on the track at a speed of about 200 km/h. The first car of the test train is completely destroyed and several people are killed or injured.

Participants

Steel construction
Concrete construction
(role unknown)

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10000085
  • Published on:
    23/02/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine