0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Elbebrücke Hohenwarthe
Official designation: BW 44
Beginning of works: June 1994
Completion: December 1997
Duration of works: 42 months
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Elbe River
Carries:
  • Autobahn A2
Part of:
Replaces: Hohenwarthe Bridge (1937)
Coordinates: 52° 13' 16" N    11° 42' 15" E
Show coordinates on a map

Technical Information

Dimensions

main span 140.71 m
total length 1 170 m
bridge surface 44 692 m²
approach viaduct
width 37.50 m
span lengths 28.20 m - 24 x 33.50 m - 11.20 m
number of spans 26
deck deck depth 1.70 m
main bridge
width 40.00 m
span lengths 93.00 m - 140.71 m - 93.00 m
number of spans 3
deck deck depth 4.52 - 7.03 m

Cost

cost of construction German Mark 107 000 000
approach viaduct
cost of construction German Mark 40 000 000
cost of construction per m² German Mark 2 119
main bridge
cost of construction German Mark 67 000 000
cost of construction per m² German Mark 3 061

Materials

piers reinforced concrete
deck of main bridge steel
deck of approach viaduct prestressed concrete
abutments reinforced concrete

Participants

Owner
Original design
Structural engineering
Construction drawings
Checking engineering
Contractor
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009925
  • Published on:
    08/08/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine