0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Echelsbacher Brücke
Beginning of works: 8 November 1928
Completion: December 1929
Duration of works: 12 months
Status: under demolition (2018)

Project Type

Location

Location: , , ,
, , ,
Address: B 23
Crosses:
  • Ammer River
Replaced by: Echelsbach Bridge (2022)
Coordinates: 47° 42' 38.30" N    10° 58' 35.70" E
Show coordinates on a map

Technical Information

Dimensions

height 76 m
length 189 m
height above valley floor or water 76 m
arches width 1.5 m
rise 31.80 m
height 2.0 - 3.0 m
arch span 130 m
deck deck width 8.3 m
Widening
deck deck width 1984: 10.76 m

Quantities

structural steel 400 t
concrete volume 3 300 m³
reinforcing steel 100 t

Cost

cost of construction Reichsmark 900 000

Materials

deck reinforced concrete
arch reinforced concrete
abutments reinforced concrete
piers on arch reinforced concrete

Participants

Design
Structural engineering
Co-contractor
Demolition (2018-2019)
Owner

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000516
  • Published on:
    18/11/1999
  • Last updated on:
    05/03/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine