• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Diessenhofen Covered Bridge

General Information

Beginning of works: 1814
Completion: 1816
Status: in use

Project Type

Structure: Covered bridge
Function / usage: Road bridge
Material: Wooden bridge

Location

Location: , , ,
, ,
Crosses:
Coordinates: 47° 41' 26.95" N    8° 45' 3.31" E

Technical Information

Dimensions

width 6.10 m
height ca. 6.30 m
total length 86.70 m

Materials

superstructure wood

Chronology

9 November 1944

An accidental bomb drop by the American forces destroys the northern part of the bridge.

1946
- 1947

Repair of the bridge damage.

1996

Restoration.

Participants

Owner
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001526
  • Date created
    14/07/2001
  • Last Update
    05/02/2016