• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Denkendorf Tunnel

General Information

Other name(s): Tunnel Denkendorf
Beginning of works: 2001
Completion: 2006
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Cut-and-cover method

Location

Location: Denkendorf, Eichstätt (Kreis), Bavaria, Germany
Part of:

Technical Information

Dimensions

length 1 950 m

Materials

tunnel structure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

  • About this
    data sheet
  • Structure-ID
    20003958
  • Date created
    24/06/2002
  • Last Update
    22/07/2014