• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Rabenstein Viaduct

Rabenstein Viaduct

General Information

Structural Type: Truss bridge
Function / usage: Railroad (railway) bridge
Built: 1896 - 1897

Geographic Information & Related Structures

Location: Chemnitz, Saxony, Germany, Europe

Technical Information

Dimensions

main span 39.6 m
width 4.5 m
total length 150 m
height above valley floor or water 17.9 m

Cost

cost of construction Goldmark 190 836

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

Internal Information
Structure-ID: s0041362
Created: 17/12/2008
Last Updated: 07/10/2013