• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Rippachtal Junction Bridge No. 3/08

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: T-section girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Precast girders with cast-in-situ slab
Official designation: BW 03/08
Built: 1996 - 1997
Duration of works: 20 months
Status: in use

Geographic Information & Related Structures

Location: Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany, Europe
Carries
  • Autobahn A38
Crosses
  • Autobahn A9
Part of:

Technical Information

Dimensions

total length 81.00 m
span lengths 18.0 m - 2 x 22.5 m - 18.0 m
clearance 4.80 m
bridge surface 4 131 m²
deck deck depth 1.10 m
deck width 51.0 m

Quantities

concrete volume 5 720 m³
reinforcing steel 512 t

Cost

cost of construction German Mark 6 500 000
cost of construction per m2 German Mark 1 577

Materials

deck slab reinforced concrete
girders precast reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information
Structure-ID: s0020175
Created: 21/03/2006
Last Updated: 23/07/2014