0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Staircase to Saint-Charles Station

General Information

Beginning of works: 1923
Completion: 1925
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Pedestrian bridge (footbridge)
Material: Steel bridge

Location

Location: , , ,
Next to: Saint Charles Station (1893)
Coordinates: 43° 18' 6.72" N    5° 22' 49.89" E
Show coordinates on a map

Technical Information

Materials

deck steel

Participants

Architecture

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019927
  • Published on:
    11/03/2006
  • Last updated on:
    25/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine