0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Ponte Domenico Carpanini
Beginning of works: 1997
Completion: 2004
Duration of works: 480 days
Status: in use

Project Type

Structure: Through truss bridge
Support conditions:
Function / usage: Road bridge
Material: Steel bridge
Plan view: Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Coordinates: 45° 4' 56" N    7° 41' 6" E
Show coordinates on a map

Technical Information

Dimensions

width 12 m
length 43 m

Cost

cost of construction Euro 2 400 000

Materials

deck steel
truss steel

Participants

Architecture
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20019388
  • Published on:
    07/02/2006
  • Last updated on:
    26/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine