0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: November 2006
Status: in use

Project Type

Location

Location: , , , ,
Carries:
  • Route Nationale RN 90
Crosses:
  • Isère River
See also: Centron Upstream Viaduct
Connects to: Siaix Tunnel (1990)
Coordinates: 45° 31' 43.76" N    6° 35' 16.75" E
Show coordinates on a map

Technical Information

Dimensions

bridge surface 7 500 m²
deck slab width 14.96 m
piers height max. 32.42 m
main bridge
total length 421.50 m
span lengths 67.50 m - 82.50 m - 125.00 m - 82.50 m - 64.00 m
number of spans 5
girder depth 1.911 - 4.00 m

Quantities

structural steel 2 100 t
concrete volume 6 500 m³
reinforcing steel 900 t
micropiles total length of piles 700 m
piles total length of piles 360 m

Cost

cost of construction (incl. taxes) Euro 16 500 000

Materials

deck slab reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20017758
  • Published on:
    11/09/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine