0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1923
Completion: 1928
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Drilling and blasting

Awards and Distinctions

Location

Location: , , ,
, , ,
Coordinates: 39° 54' 8" N    105° 38' 47" W
Show coordinates on a map

Technical Information

Dimensions

total length 9.9 km

Cost

cost of construction ca. United States dollar 15 600 000

Chronology

1921

Legislation passed to initiate Moffat Tunnel.

29 April 1923

Moffat Tunnel Improvement District formed.

7 July 1927

Moffat Tunnel "holed through".

24 February 1928

First freight train passes through the tunnel.

26 February 1928

Opening ceremonies.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20016626
  • Published on:
    15/06/2005
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine