• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Wurzen-Bennewitz Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: main bridge:
Cantilever truss bridge
Function / usage: Road bridge
Other name(s): Muldebrücke Wurzen
Built: 2004 - 2006
Duration of works: 32 months
Status: in use

Geographic Information & Related Structures

Location: Wurzen, Leipzig (Kreis), Saxony, Germany, Europe
Bennewitz, Leipzig (Kreis), Saxony, Germany, Europe
Crosses
  • Mulde River

Technical Information

Dimensions

total length 528 m
approach deck depth 1.1 m
total length 315 m
span lengths 20 m - 11 x 24.80 m - 20 m
bridge surface 6 944 m²
main bridge deck depth 2.5 m
total length 215 m
span lengths 70 m - 100 m - 45 m
bridge surface 4 789 m²
truss height max. 11 m
length 85 m

Quantities

substructure concrete volume 2 827 m³
reinforcing steel 452 t
superstructure structural steel 1 950 t
concrete volume 7 195 m³
prestressing steel 250 t
reinforcing steel 1 069 t

Cost

cost of construction Euro 12 700 000

Materials

truss steel
deck of main bridge composite steel-reinforced concrete
deck of approach prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information
Structure-ID: s0014912
Created: 30/12/2004
Last Updated: 07/10/2013