• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Float Viaduct

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Girder bridge
Function / usage: Railroad (railway) bridge
Completed in: 1999
Status: in use

Geographic Information & Related Structures

Location: Carstairs, South Lanarkshire, Scotland, United Kingdom, Europe
Crosses
  • Clyde River

Technical Information

Dimensions

total length 80 m
number of spans 4

Cost

cost of construction Pound sterling 700 000

Materials

deck steel

Chronology

2000

Winner of the Structural Steel Design Award.

Participants

Owner
Structural engineering
Main contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

There is no relevant literature listed in the database.

Internal Information
Structure-ID: s0009249
Created: 12/05/2003
Last Updated: 23/07/2014