0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1860
Completion: 20 December 1862
Status: dismantled (1912)

Project Type

Structure: main bridge:
Pauli truss bridge
main bridge:
Through truss bridge
Function / usage: Railroad (railway) bridge
Material: Iron bridge

Location

Location: , ,
Crossed:
  • Rhine River
Replaced by: Südbrücke Mainz (1912)

Technical Information

Dimensions

main bridge
span lengths 4 x 105.26 m
number of spans 4

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008282
  • Published on:
    15/02/2003
  • Last updated on:
    04/05/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine