0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 22 June 1956
Status: demolished

Project Type

Awards and Distinctions

1956 Honorable Mention  

Location

Location: , , ,
Replaced by: Sidney Lanier Bridge (2003)
Coordinates: 31° 7' 4.70" N    81° 29' 5.03" W
Show coordinates on a map

Technical Information

Dimensions

length of movable section 89.9 m

Cost

cost of construction United States dollar 8 000 000

Materials

towers steel
deck truss steel

Chronology

22 June 1956

Opened to traffic.

Participants

Design
Consulting engineers
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006720
  • Published on:
    10/11/2002
  • Last updated on:
    27/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine