0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , , ,
Carries:
  • Autoroute A55
Part of:

Technical Information

Dimensions

deck deck depth 2.85 m
Eastern bridge
total length 296.3 m
span lengths 31.7 m - 2 x 40 m - 38.6 m - 2 x 43 m - 33 m - 27 m
number of spans 8
Western bridge
total length 286 m
span lengths 23 m - 29 m - 43 m - 2 x 40 m - 43 m - 38 m - 30 m
number of spans 8

Quantities

deck concrete volume 0.77 m³/m²
prestressing steel 25 kg/m³
reinforcing steel 135 kg/m³

Materials

deck prestressed lightweight concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003245
  • Published on:
    15/05/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine