0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Welfare Island Bridge
Beginning of works: 17 March 1952
Completion: 18 May 1955
Status: in use

Project Type

Awards and Distinctions

1955 award winner  

Location

Location: , , ,
, , ,
Crosses:
  • East River
Coordinates: 40° 45' 48" N    73° 56' 45" W
Show coordinates on a map

Technical Information

Dimensions

main span 127.41 m
width 12.19 m
total length 876.91 m
vertical navigation clearance max. 30 m

Cost

cost of construction United States dollar 6 500 000

Materials

superstructure steel
towers steel

Chronology

17 March 1952

Construction started

18 March 1955

Opened to traffic

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20001734
  • Published on:
    12/08/2001
  • Last updated on:
    27/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine