TGV Eastern Junction

TGV Eastern JunctionViaduc de Chalifert.

General Information

Function / usage: High-speed rail line
Other name(s): LGV Interconnexion Est
Built: 1994 - 1996
Status: in use

Geographic Information & Related Structures

km Name

Technical Information

Dimensions

total length 102 km
embankment 9 000 000 m³
number of road bridges ca. 61
number of rail bridges ca. 32
number of hydraulic structures ca. 70
number of cut-and-cover tunnels 8
number of bored tunnels 1
Lot 42.02/49.03
total length 280 m
embankment 37000 m³
embankment 37000 m³
period of construction (in months) 12
Lot 42.10
total length 2463 m
embankment 300 000 m³
embankment 300 000 m³
period of construction (in months) 17
Lot 42.30
total length 204 m
embankment 70000 m³
embankment 70000 m³
period of construction (in months) 17
Lot 42.40
total length 515 m
embankment 16760 m³
embankment 16760 m³
period of construction (in months) 12
Lot 42.50
total length 361 m
embankment 50000 m³
embankment 50000 m³
period of construction (in months) 17
Lot 42.60
total length 874 m
embankment 90000 m³
embankment 90000 m³
period of construction (in months) 22
Lot 43A
total length 18 370 m
embankment 1730000 m³
embankment 1730000 m³
period of construction (in months) 23
Lot 43B
total length 2 700 m
embankment 145000 m³
embankment 145000 m³
period of construction (in months) 29
Lot 43C
total length 2 198 m
embankment 137000 m³
embankment 137000 m³
period of construction (in months) 30
Lot 44
total length 43 000 m
embankment 4600000 m³
embankment 4600000 m³
period of construction (in months) 23
Lot 45
total length 1400 m
embankment 1360000 m³
embankment 1360000 m³
period of construction (in months) 20
Lot 46A
total length 3400 m
embankment 550 000 m³
embankment 550 000 m³
period of construction (in months) 40
Lot 46B
total length 2 900 m
embankment 65000 m³
embankment 65000 m³
period of construction (in months) 36
Lot 46C
total length 4000 m
embankment 202 000 m³
embankment 202 000 m³
period of construction (in months) 25
Lot 49.06
total length 420 m
embankment 64000 m³
embankment 64000 m³
period of construction (in months) 20
Lot 49.13
total length 400 m
embankment 50000 m³
embankment 50000 m³
period of construction (in months) 18
Lot 49.15
total length 150 m
embankment 800 m³
embankment 800 m³
period of construction (in months) 9
Lot 49.23
total length 340 m
embankment 52000 m³
embankment 52000 m³
period of construction (in months) 18

Quantities

excavated material 16 000 000 m³
Lot 42.02/49.03
concrete volume 2800 m³
concrete volume 2800 m³
reinforcing steel 360 t
reinforcing steel 360 t
Lot 42.10
concrete volume 45 110 m³
concrete volume 45 110 m³
reinforcing steel 3 900 t
reinforcing steel 3 900 t
volume of extracted material 1 700 000 m³
volume of extracted material 1 700 000 m³
Lot 42.30
concrete volume 35100 m³
concrete volume 35100 m³
reinforcing steel 2900 t
reinforcing steel 2900 t
volume of extracted material 145000 m³
volume of extracted material 145000 m³
Lot 42.40
concrete volume 86570 m³
concrete volume 86570 m³
reinforcing steel 6695 t
reinforcing steel 6695 t
volume of extracted material 167700 m³
volume of extracted material 167700 m³
Lot 42.50
concrete volume 12190 m³
concrete volume 12190 m³
reinforcing steel 1236 t
reinforcing steel 1236 t
volume of extracted material 110000 m³
volume of extracted material 110000 m³
Lot 42.60
concrete volume 40760 m³
concrete volume 40760 m³
reinforcing steel 3890 t
reinforcing steel 3890 t
volume of extracted material 145000 m³
volume of extracted material 145000 m³
Lot 43A
concrete volume 21000 m³
concrete volume 21000 m³
reinforcing steel 2100 t
reinforcing steel 2100 t
volume of extracted material 1450000 m³
volume of extracted material 1450000 m³
Lot 43B
concrete volume 34400 m³
concrete volume 34400 m³
reinforcing steel 5450 t
reinforcing steel 5450 t
volume of extracted material 450000 m³
volume of extracted material 450000 m³
Lot 43C
concrete volume 63000 m³
concrete volume 63000 m³
reinforcing steel 6600 t
reinforcing steel 6600 t
volume of extracted material 900000 m³
volume of extracted material 900000 m³
Lot 44
concrete volume 48500 m³
concrete volume 48500 m³
reinforcing steel 4520 t
reinforcing steel 4520 t
volume of extracted material 8850000 m³
volume of extracted material 8850000 m³
Lot 45
concrete volume 25000 m³
concrete volume 25000 m³
reinforcing steel 2800 t
reinforcing steel 2800 t
volume of extracted material 690 000 m³
volume of extracted material 690 000 m³
Lot 46A
concrete volume 43000 m³
concrete volume 43000 m³
reinforcing steel 8000 t
reinforcing steel 8000 t
volume of extracted material 300 000 m³
volume of extracted material 300 000 m³
Lot 46B
concrete volume 90000 m³
concrete volume 90000 m³
reinforcing steel 2400 t
reinforcing steel 2400 t
volume of extracted material 300 000 m³
volume of extracted material 300 000 m³
Lot 46C
concrete volume 88000 m³
concrete volume 88000 m³
reinforcing steel 7000 t
reinforcing steel 7000 t
volume of extracted material 450 000 m³
volume of extracted material 450 000 m³
Lot 49.06
concrete volume 6300 m³
concrete volume 6300 m³
reinforcing steel 1300 t
reinforcing steel 1300 t
volume of extracted material 60000 m³
volume of extracted material 60000 m³
Lot 49.13
concrete volume 2600 m³
concrete volume 2600 m³
reinforcing steel 350 t
reinforcing steel 350 t
volume of extracted material 4000 m³
volume of extracted material 4000 m³
Lot 49.15
concrete volume 2500 m³
concrete volume 2500 m³
reinforcing steel 220 t
reinforcing steel 220 t
volume of extracted material 10000 m³
volume of extracted material 10000 m³
Lot 49.23
concrete volume 5600 m³
concrete volume 5600 m³
reinforcing steel 530 t
reinforcing steel 530 t
volume of extracted material 2000 m³
volume of extracted material 2000 m³

Cost

Lot 42.02/49.03
cost of lot French Franc 25 000 000
Lot 42.10
cost of lot French Franc 256 000 000
Lot 42.30
cost of lot French Franc 126 000 000
Lot 42.40
cost of lot French Franc 201 000 000
Lot 42.50
cost of lot French Franc 38 000 000
Lot 42.60
cost of lot French Franc 128 000 000
Lot 43A
cost of lot French Franc 314 000 000
Lot 43B
cost of lot French Franc 200 000 000
Lot 43C
cost of lot French Franc 352 000 000
Lot 44
cost of lot French Franc 743 000 000
Lot 45
cost of lot French Franc 244 000 000
Lot 46A
cost of lot French Franc 400 000 000
Lot 46B
cost of lot French Franc 300 000 000
Lot 46C
cost of lot French Franc 295 000 000
Lot 49.06
cost of lot French Franc 53 000 000
Lot 49.13
cost of lot French Franc 25 000 000
Lot 49.15
cost of lot French Franc 12 000 000
Lot 49.23
cost of lot French Franc 31 000 000

Participants

Owner
Client
Geotechnical/geological experts
Lot 42.02/49.03 (Franchissement de la RN2 / Franchissement de la voie ferrée La Plaine-Hirson)
Contractor
Lot 42.10 (Génie civil de la traversée du Nord de l’aéroport Charles-de-Gaulle)
Contractor
Lot 42.30 (Génie civil de l’entonnement Sud de la gare TGV / RER)
Contractor
Earthworks
Lot 42.40 (Génie civil de la traversée de la piste 2 de l’aéroport Charles-de-Gaulle par le TGV et le RER)
Contractor
Lot 42.50 (Génie civil de la traversée Sud de l’aéroport Charles-de-Gaulle)
Contractor
Lot 42.60 (Tranchée couverte du prolongement du RER B)
Contractor
Lot 43A (Travaux de génie civil entre Tremblay-en-France et Jablines)
Contractor
Lot 43B (Tranchée couverte et viaduc de Chalifert)
Contractor
Lot 43C (Traversée du site d’Euro Disney)
Contractor
Lot 44 (Travaux de génie civil entre Chessy et Moisenay)
Contractor
Lot 45 (Génie civil de Marolles-en-Brie au Triangle de Coubert)
Contractor
Lot 46A (Génie civil de Créteil à Valenton)
Contractor
Lot 46B (Tunnel de Limeil)
Contractor
Lot 46C (Tranchée couverte de Villecresnes)
Contractor
Earthworks
Lot 49.06 (Viaduc de la Marne et terrassements)
Contractor
Lot 49.13 (Franchissement autoroute A4)
Contractor
Lot 49.15 (Franchissement voie ferrée Paris-Mulhouse)
Contractor
Lot 49.23 (Franchissement de l’autoroute A5)
Contractor

Relevant Web Sites

Relevant Publications

Internal Information
Structure-ID: p0000036
Created: 28/10/2000
Last Updated: 22/07/2014