Built: 1989 - 1993

Geographic Information & Related Structures

km Name
393.230
394.900
437.500
439.140
441.550
464.700
466.650

Technical Information

Dimensions

length 115.620 km
Lot 11 (TOARC)
total length 40 226 m
embankment 4 890 000 m³
period of construction (in months) 22
Lot 12
total length 3 255 m
embankment 52 000 m³
embankment 52 000 m³
period of construction (in months) 23
Lot 13
total length 535 m
embankment 20 000 m³
embankment 20 000 m³
period of construction (in months) 17
Lot 15
total length 1 680 m
embankment 91 000 m³
embankment 91 000 m³
period of construction (in months) 18
Lot 16
total length 199 m
embankment 125 000 m³
embankment 125 000 m³
period of construction (in months) 15
Lot 17
embankment 100 000 m3
embankment 100 000 m3
period of construction (in months) 18
Lot 22
period of construction (in months) 23.5
Lot 22 (TOARC)
total length 17 519 m
period of construction (in months) 23.5
Lot 23
total length 2 154 m
embankment 10 000 m³
embankment 10 000 m³
period of construction (in months) 40
Lot 24 (TOARC Médian)
total length 22 470 m
embankment 2 950 000 m³
embankment 2 950 000 m³
period of construction (in months) 30.5
Lot 25
total length 3 088 m
period of construction (in months) 40.5
Lot 26 (TOARC Sud)
total length 27 721 m
embankment 2 450 000 m³
embankment 2 450 000 m³
period of construction (in months) 28
Lot 31
total length 2 100 m
embankment 124 000 m³
embankment 124 000 m³
period of construction (in months) 15.5
Lot 41
embankment 30 000 m³
embankment 30 000 m³
period of construction (in months) 12.5
Lot 52
total length 565 m
Lot 54
total length 218 m
period of construction (in months) 30.5
Lot 56
total length 252 m
period of construction (in months) 28
Lot 62
total length 611 m
period of construction (in months) 23.5
Lot 66
total length 222 m
period of construction (in months) 28

Quantities

Lot 11 (TOARC)
concrete volume 54 790 m³
reinforcing steel 4 541 t
volume of extracted material 7 295 000 m³
Lot 12
concrete volume 103 838 m³
concrete volume 103 838 m³
reinforcing steel 10 024 t
reinforcing steel 10 024 t
volume of extracted material 366 000 m³
volume of extracted material 366 000 m³
Lot 13
concrete volume 14 987 m³
concrete volume 14 987 m³
reinforcing steel 1 601 t
reinforcing steel 1 601 t
volume of extracted material 77 000 m³
volume of extracted material 77 000 m³
Lot 15
concrete volume 47213 m³
concrete volume 47213 m³
reinforcing steel 5 375 t
reinforcing steel 5 375 t
volume of extracted material 900 000 m³
volume of extracted material 900 000 m³
Lot 16
concrete volume 3433 m³
concrete volume 3433 m³
reinforcing steel 954 t
reinforcing steel 954 t
volume of extracted material 170 000 m³
volume of extracted material 170 000 m³
Lot 17
concrete volume 5 274 m³
concrete volume 5 274 m³
reinforcing steel 535 t
reinforcing steel 535 t
volume of extracted material 105 000 m³
volume of extracted material 105 000 m³
Lot 22 (TOARC)
concrete volume 11 420 m³
concrete volume 11 420 m³
reinforcing steel 1 893 t
reinforcing steel 1 893 t
Lot 23
concrete volume 94 000 m³
concrete volume 94 000 m³
reinforcing steel 5 385 t
reinforcing steel 5 385 t
volume of extracted material 300 000
volume of extracted material 300 000
Lot 24 (TOARC Médian)
concrete volume 30 319 m³
concrete volume 30 319 m³
reinforcing steel 2 938 t
reinforcing steel 2 938 t
volume of extracted material 6 000 000 m³
volume of extracted material 6 000 000 m³
Lot 25
concrete volume 134779 m³
concrete volume 134779 m³
reinforcing steel 3 075 t
reinforcing steel 3 075 t
volume of extracted material 400 000 m³
volume of extracted material 400 000 m³
Lot 26 (TOARC Sud)
concrete volume 34 810 m³
concrete volume 34 810 m³
reinforcing steel 3 594 t
reinforcing steel 3 594 t
volume of extracted material 4 350 000 m³
volume of extracted material 4 350 000 m³
Lot 31
concrete volume 6 317 m³
concrete volume 6 317 m³
reinforcing steel 544 t
reinforcing steel 544 t
volume of extracted material 411 000 m³
volume of extracted material 411 000 m³
Lot 41
concrete volume 6 224 m³
concrete volume 6 224 m³
reinforcing steel 533 t
reinforcing steel 533 t
volume of extracted material 43 000 m³
volume of extracted material 43 000 m³
Lot 52
concrete volume 11 420 m³
concrete volume 11 420 m³
reinforcing steel 2 819 t
reinforcing steel 2 819 t
Lot 54
concrete volume 3 272 m³
concrete volume 3 272 m³
reinforcing steel 1 247 t
reinforcing steel 1 247 t
Lot 56
concrete volume 4 975 m³
concrete volume 4 975 m³
reinforcing steel 302 t
reinforcing steel 302 t
Lot 62
concrete volume 12 687 m³
concrete volume 12 687 m³
reinforcing steel 1 426 t
reinforcing steel 1 426 t
Lot 66
concrete volume 3 705 m³
concrete volume 3 705 m³
reinforcing steel 1 345 t
reinforcing steel 1 345 t

Design Loads

design speed 300 km/h

Cost

Lot 11 (TOARC)
cost of lot French Franc 525 000 000
Lot 12
cost of lot French Franc 460 000 000
Lot 13
cost of lot French Franc 64 000 000
Lot 15
cost of lot French Franc 172 000 000
Lot 16
cost of lot French Franc 28 200 000
Lot 22
cost of lot French Franc 25 400 000
Lot 22 (TOARC)
cost of lot French Franc 319 500 000
Lot 23
cost of lot French Franc 390 000 000
Lot 24 (TOARC Médian)
cost of lot French Franc 401 300 000
Lot 25
cost of lot French Franc 593 700 000
Lot 26 (TOARC Sud)
cost of lot French Franc 419 500 000
Lot 31
cost of lot French Franc 43 500 000
Lot 52
cost of lot French Franc 59 800 000
Lot 54
cost of lot French Franc 26 000 000
Lot 56
cost of lot French Franc 32 900 000
Lot 62
cost of lot French Franc 60 200 000
Lot 66
cost of lot French Franc 32 100 000

Participants

Owner
Client
Earthworks
Lot 11 (TOARC)
Main contractor
Lot 12
Main contractor
Co-contractor
Lot 13
Main contractor
Lot 15
Main contractor
Lot 16
Main contractor
Lot 17
Main contractor
Lot 22 (TOARC)
Main contractor
Lot 23
Main contractor
Lot 24 (TOARC Médian)
Main contractor
Lot 26 (TOARC Sud)
Main contractor
Lot 31
Main contractor
Lot 41
Main contractor
Lot 52
Main contractor
Lot 54
Main contractor
Lot 56
Main contractor
Lot 62
Main contractor
Lot 66
Main contractor

Relevant Web Sites

Relevant Publications

Internal Information
Structure-ID: p0000034
Created: 28/10/2000
Last Updated: 22/07/2014