• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Conwy Tunnel

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Immersed tube tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method
Built: 1986 - 1991
Status: in use

Geographic Information & Related Structures

Location: Conwy, Conwy, Wales, United Kingdom, Europe
For
  • A55 Motorway

Technical Information

Dimensions

tunnel length 710 m

Cost

cost of construction Pound sterling 102 000 000

Materials

tunnel structure precast reinforced concrete

Participants

Structural engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information
Structure-ID: s0009179
Created: 25/04/2003
Last Updated: 23/07/2014