General Information

Completion: 2003
Duration of works: 20 months
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Seine River
Carries:
  • Autoroute A104
Next to: Pont autoroutier de Corbeil-Essonnes
Coordinates: 48° 37' 29" N    2° 28' 16" E
Show coordinates on a map

Technical Information

Dimensions

total length 210 m
span lengths 56.65 m - 95.68 m - 56.65 m
number of spans 3
abutments number 2
deck deck depth 2.00 - 5.00 m
web thickness 0.36 m
piers number 4

Quantities

deck prestressing steel 140 t
reinforcing steel 644 t
concrete for deck 11 825 t
foundations reinforcing steel 157 t
concrete for foundations 6 420 t

Cost

cost of construction (incl. taxes) Euro 11 956 337

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010610
  • Published on:
    06/11/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine