0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 18 January 2007
Completion: 2011
Duration of works: 34 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel

Location

Location: , , ,
Part of:
Coordinates: 47° 33' 15.22" N    6° 39' 21.45" E
Coordinates: 47° 33' 22.09" N    6° 40' 54.85" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 970 m
tunnel section area 80 m²
length of bored tunnels 1 730 m

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20028480
  • Published on:
    12/06/2007
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine