Chalifert Viaduct

General Information

Other name(s): Viaduc de Chalifert
Beginning of works: 1990
Completion: 1993
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: High-speed rail bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Chalifert Canal
Part of:

Technical Information

Dimensions

main span 55 m
total length 1 175 m
embankment 145 000 m³
deck deck depth 3.70 m

Quantities

structural steel 5 450 t
concrete volume 34 400 m³
excavated material 450 000 m³

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003114
  • Date created
    16/02/2002
  • Last Update
    05/02/2016