• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Caiyuanba Bridge

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Beginning of works: 2003
Completion: 2007
Status: in use

Project Type

Structure: Half-through arch bridge
Function / usage: Road bridge
Monorail bridge
Material: Steel bridge

Geographic Information & Related Structures

Location: Chongqing, China
Crosses:
  • Yangtze River

Technical Information

Dimensions

arch span 420 m
main bridge total length 800 m
span lengths 88 m - 102 m - 420 m - 102 m - 88 m
deck width 36.500 m

Quantities

structural steel 25 900 t
concrete volume 53 000 m³

Materials

piers prestressed concrete
arch steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011455
  • Date created
    10/01/2004
  • Last Update
    29/07/2014