• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Brücke Lister Damm

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Other name(s): Brücke Nr. 232
Completion: 1999
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Geographic Information & Related Structures

Location: Hanover, Region Hannover, Lower Saxony, Germany
Crosses:
  • Mittellandkanal
Part of:
Replaces: Brücke Lister Damm (1912)

Technical Information

Dimensions

arch span 58.82 m
total width 9.00 m

Cost

cost of construction German Mark 3 600 000

Materials

arch steel

Chronology

June 1999

Construction begins.

December 1999

Completion.

April 2000

Opened to traffic.

Participants

Structural engineering
Checking engineering
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008704
  • Date created
    21/03/2003
  • Last Update
    22/07/2014