• de
  • en
  • fr
  • International Database for Civil and Structural Engineering
Advertising

Brücke Hebbelstrasse

General Information

Other name(s): Brücke Nr. 234
Beginning of works: 1998
Completion: 1999
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Crosses:
  • Mittellandkanal
Part of:
Replaces: Brücke Hebbelstrasse (1912)

Technical Information

Dimensions

arch span 58.40 m
total width 9.10 m

Quantities

structural steel 270 t

Cost

cost of construction German Mark 4 200 000

Materials

arch steel
abutments reinforced concrete

Chronology

June 1998

Construction begins.

December 1999

Completion.

April 2000

Opened to traffic.

Participants

Structural engineering
Checking engineering
  • Peil (checking engineer)
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008708
  • Date created
    21/03/2003
  • Last Update
    05/02/2016