• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Bosphorus Bridge

General Information

Beginning of works: 20 February 1970
Completion: 1 June 1973
Status: in use

Project Type

Location

Location: , ,
Near: Fatih Sultan Mehmet Bridge (1988)
Coordinates: 41° 2' 23.92" N    29° 2' 24.37" E
Coordinates: 41° 3' 3.68" N    29° 1' 42.89" E

Technical Information

Dimensions

main span 1 074 m
span lengths 40 m - 3 x 45 m - 56 m - 1 074 m - 4 x 63.75 m
clearance 64 m

Materials

cables steel
pylons steel

Participants

Design
Structural engineering
Construction
Co-contractor
Monitoring (2008)
Measurement concept / monitoring
Monitoring equipment

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001368
  • Date created
    11/03/2001
  • Last Update
    05/02/2016