• de
  • en
  • fr
  • International Database for Civil and Structural Engineering

Avonmouth Bridge

General Information

Beginning of works: 1969
Completion: 1973
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Avon
Coordinates: 51° 29' 19.80" N    2° 41' 34.77" W

Technical Information

Dimensions

main span 164 m
total length 1 388 m

Materials

deck prestressed concrete

Participants

Design
Contractor
Resident engineering
Strengthening (1999)
Client
Consulting engineers
Contractor
Steel construction

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005069
  • Date created
    16/09/2002
  • Last Update
    05/02/2016