0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1911
Completion: 1912
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: , ,
, ,
Crosses:
  • Aare River
Coordinates: 47° 19' 13.02" N    7° 53' 52.91" E
Show coordinates on a map

Technical Information

Dimensions

span 71.92 m
total width 9.50 m

Materials

deck reinforced concrete
arch reinforced concrete
piers on arch reinforced concrete

Chronology

1969

Due to severe deterioration of the piers on the arch supporting the original deck, the vertical supports and the deck are removed and replaced by a prestressed concrete deck. Since then the bridge has an overall appearance more like the later three-hinged arch bridges of Robert Maillart.

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005406
  • Published on:
    23/09/2002
  • Last updated on:
    21/08/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine