0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 50.1
Beginning of works: 2005
Completion: 2006
Duration of works: 18 months
Status: in use

Project Type

Awards and Distinctions

2008 entry  

Location

Location: , , ,
Address: B 2
Crosses:
  • Autobahn A38
Part of:
Coordinates: 51° 14' 53.79" N    12° 23' 32.81" E
Show coordinates on a map

Technical Information

Dimensions

span 87.92 m
bridge surface 4 809 m²
arch rise ca. 15 m
deck deck width 2 x 25.50 m
roadway / carriageway width 2 x 11.50 m

Quantities

structural steel 1 621 t

Cost

cost of construction Euro 7 500 000

Materials

arches steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20034786
  • Published on:
    29/02/2008
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine