0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Replacement of the US 90 Bridge across St. Louis Bay

 Replacement of the US 90 Bridge across St. Louis Bay
Author(s): ,
Presented at 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, published in , pp. 356-357
DOI: 10.2749/222137908796292975
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.09 MB

The 3.38 km US 90 Bridge over St. Louis Bay was awarded by the Mississippi DOT five months after Hurricane Katrina destroyed the original bridge. This Design/Build Project has recently finished c...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Published in:
Page(s): 356-357 Total no. of pages: 6
Page(s): 356-357
Total no. of pages: 6
Year: 2008
DOI: 10.2749/222137908796292975
Abstract:

The 3.38 km US 90 Bridge over St. Louis Bay was awarded by the Mississippi DOT five months after Hurricane Katrina destroyed the original bridge. This Design/Build Project has recently finished construction and successfully met the deadlines of opening the first two lanes by May 17th (15 months after award) and the entire bridge on February 15th. The bridge is built as two separate structures except for the navigation unit, where the deck and substructure are continuous between the eastbound and westbound structures.<7p>

Keywords:
precast post-tensioning prestressed design build piles capbeams spliced girders