0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Personal Involvement in early US Cable-Stayed Bridges

 Personal Involvement in early US Cable-Stayed Bridges
Author(s):
Presented at 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, published in , pp. 27-34
DOI: 10.2749/222137908796219363
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.08 MB

The personal involvement of the author in the early US cable-stayed bridges is outlined, including the Pasco and Huntington concrete bridges and the Burlington and Fred Hartman composite bridges.
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Published in:
Page(s): 27-34 Total no. of pages: 8
Page(s): 27-34
Total no. of pages: 8
Year: 2008
DOI: 10.2749/222137908796219363
Abstract:

The personal involvement of the author in the early US cable-stayed bridges is outlined, including the Pasco and Huntington concrete bridges and the Burlington and Fred Hartman composite bridges.

Keywords:
cable-stayed bridges post-tensioning construction engineering aerodynamic stability free cantilevering design alternates concrete girders composite girders

Structures and Projects

Structure Types

Persons